Four projects, three of them in final stages of procurement.

The work runs from a full resource recovery facility down to a community recycling scheme, which is how the model scales: it can start with the infrastructure a place already has.

All Projects

Soualiga · Community Recycling

Status:  Final stages of procurement | Location:  Sint Maarten

The recovery scheme ahead of the gasifier: metals, glass and tyres recovered, with value shared to schools and a community fund.

HydroGenyse MKE- WTE Business Park

Status:  Proposed for 2027 | Location:  Century City Business Park Milwaukee WI.

A single-line facility designed to process MSW into power to be utilized exclusively on the same site. Proposal includes grocery, ethnic grocery stores with shared kitchens and coolers, Mega scale laundry utilizing waste heat, ozone metered soaps and subsidized costs, refrigerated warehoused, urban large scale hydroponics and food processing. 

GEBE Phase 0 · Waste Heat Recovery

Status:  Final stages of procurement | Location:  Sint Maarten, at the existing power plant

Recovers heat currently lost at the island’s existing power station, cutting fuel use immediately and preparing the grid for the hydrogen

Separate from the waste-to-hydrogen work.

Two further programmes run under the Soualiga name: solar-shaded EV charging for rental fleets, and a separate solar programme. They are distinct businesses and are presented separately rather than as part of the resource recovery story.

One model, several forms.

The approach scales from a community recycling scheme to a full resource recovery facility, and can begin with the infrastructure a place already has.